moladi  alternative construction process

  • Position raft foundation former
  • Dig Foundation trenches
  • Place underlay and reinforcing according to Engineer design and cast dense concrete
  • Power float slab
  • Erect moladi plastic shutter formwork
  • Place plumbing and electrical pipes-window and door frames - reinforcing - roof truss blockouts - 4 hours.
  • Fill moladi formwork with mortar (concrete without stone), either by bucket or pump - 2 hours
  • Remove the moladi formwork the following day.
  • Fix Ceiling, roof, electrical wiring, paint glaze, etc.
  • Complete

 

 

 

 

 

Low Cost Housing, low cost building system, Alternative construction, Low cost, alternative construction, low cost material, low cost technology, low cost housing, moladi formwork

 
     

moladi Low cost housing construction system - Challenging the tradition bound construction industry since 1986

Copyright moladi

 

Updated